Superstructure
Clay bricks walls
All plastered and painted internal and external walls
Reinforcing in foundations where required as per Engineer
Reinforced concrete staircases
Reinforced concrete slabs to Engineer's detail
Timber door frames to internal doors
Timber external door frames and doors
Aluminium windows (coated)
Aluminium handrails inside to all staircases
Balustrading to all balconies
Timber roof trusses with Sisalation and Chromatek roodsheeting
All plastere ceiling throughout in each unit
Wall Finishes
Internal walls to be painted in high washable paint
Ceilings to be painted in White Acrylic PVA Paint
Wall tiles to ceiling height in all bathrooms ( see PC Allowances)
Wall tiles to door height in all kitchens ( see PC Allowances)
Floor Finishes
Floors in living room to be tiles, unless required differently ( see
PC Allowances)
Carpet in bedrooms
90mm Meranti skirtings to habitable rooms
SABS waterproofing to all open floors, balconies and showers, prior
to tiling.
Tiled floor to showers
Door and Locks
4 Panel solid meranti entrance door to all units
Solid brass lockset to external doors
2 Panel solid internal painted doors
2 lever solid brass locksets to internal doors
Pivot white aluminium door to showers.
|
|
|
Cupboards
Wood veneer doors to kitchen and built in cupboards
Kitchen lay-out as per client's specification.
BIC's as per plan
Vanities to main bathroom only
Tiled skirtings to bathrooms
Tops to kitchen cupboards to client's specification (See PC amount for
cupboards)
Plumbing
1700 Plexicor Windward baths
Lecelo Atlas 3 piece Toilet suites
Atlas basin and half pedestal to be installed
All Taryn bath/shower basin and sink mixers to be installed
1200 Double sink to be installed
Electrics
Single lightfitting to bathrooms and kitchens
Downlighters and dimmer switches to lounge and living areas
Downlighters and dimmer switches to main bedrooms
4 double socket outlets to kitchens
2 Double socket outlets to living area and main bedrooms
1 Double socket outlets to to other bedrooms
Sufficient lighting to external area and stairways
1 Telephone access point per unit
Extractor fan over stove hob
Intercom point to each unit.
Allowances and PC Amounts
All tiles R 100.00 /m² R 15,000
Carpets R 5,000
Stove R 3,500
Bathroom Accessories R 10,000
Mirrors R 500
All cupboards including tops R 30,000
Light fittings R 2,000
Total R 66,000
|
| |
|